Motion simulations for NnwaDoro

AuthorsJaap de Wilde
Conference/JournalMARIN report 81
DateDec 1, 2003
Reading time2 minutes

Undoubtedly the NnwaDoro LNG Project offshore Nigeria is an impressive development.With the project expected to take between four and six years,eventually around 26 MMSm3/d of gas will be gathered and processed offshore to extract condensate, as well as for LNG/LPG for export.

Tags
stability, seakeeping and ocean engineeringcfd developmentcfd/simulation/desk studiestime-domain simulationsrenewablesoil and gasinfrastructuremarine systemslife at seatransport and shippingoffloadingsimulationoffshore engineering