CNIM asks MARIN to verify the performance of a new SWATH design

AuthorsBastien Abeil
Conference/JournalMARIN Report 123
DateApr 25, 2018
Reading time3 minutes

With a growing demand for wind farm support vessels, Constructions Industrielles de la Méditerranée (CNIM) has developed a SWATH design with the aim of  providing excellent walk-to-work transfer capability, in calm water and in a developed seaway. CNIM asked MARIN to assist the company in demonstrating its performance whilst in operation at sea.

 

read online

Tags
stability, seakeeping and ocean engineeringrenewableslife at sea