Big Sweep model tests for Bluewater

AuthorsHans Cozijn
Conference/JournalMARIN Report 81
DateDec 1, 2003
Reading time2 minutes

MARIN carried out model tests on the Big Sweep LNG offloading system on behalf of Bluewater Energy Services. The Big Sweep concept consists of an underwater horizontal truss structure connected to the stern of a Floating Liquid Natural Gas (FLNG) system or a Floating Storage and Re-gasification Unit (FSRU).

Tags
stability, seakeeping and ocean engineeringmeasurements and controldata sciencerenewablesoil and gasinfrastructuremarine systemslife at seatransport and shippingmodel testingmooring and offloadingmotionsoffloadingoffshore engineering