Show all publications

MARIN tackles the first decommissioning projects

AuthorsArjan Voogt
Conference/JournalMARIN Report 88
Date1 Apr 2006
Reading time6 minutes

Last year MARIN was heavily involved in several heavy-lift projects concerning the removal of fixed structures from North Sea oil and gas fields. Most of these structures are at the end of their design life, therefore, their removal is a delicate process to avoid the collapse of the structures.

Contact

Contact person photo

Arjan Voogt

Manager

Tags
stability, seakeeping and ocean engineeringmeasurements and controldata sciencerenewablesoil and gasinfrastructuremarine systemslife at seamodel testingmonitoringmotionsfull scaleoffshore engineering