FPSO tandem offloading

AuthorsJos van Doorn & Arjan Voogt
Conference/JournalMARIN Report 73
Date1 apr. 2001
Reading time3 minutes

As operator of Block 17, TotalFinaElf E&P Angola1 intends to develop the offshore field Dalia, located approximately 80 miles off the coast of Angola. The installationbeing considered is preferably a spread-moored FPSO. Offloading is done in tandem and the export tankers range from Suezmax tankers to VLCCs, up to 315,000 DWT.

Contact

Contact person photo

Arjan Voogt

Manager

Tags
manoeuvring and nautical studiesstability, seakeeping and ocean engineeringcfd developmentcfd/simulation/desk studiessafe operations and human factorstime-domain simulationsoil and gastrainingoffloadingsimulations