AuthorsRadboud van Dijk
Conference/JournalMARIN Report 82
Date1 Mar 2004
Reading time3 minutes

Installing new topside modules on an existing Floating Production Unit (FPU) in deep water can be a challenging task. The crane vessel and semi submersible move independently and lowering a relatively light module on a moving unit Ð which is also influenced by the load Ð is no easy feat.

Contact

Contact person photo

Mailbox Offshore

Tags
stability, seakeeping and ocean engineeringcfd developmentcfd/simulation/desk studiesmeasurements and controldata sciencetime-domain simulationsrenewablesoil and gasinfrastructuremarine systemslife at seatransport and shippingmodel testingmooring and offloadingmotionssimulationsoffshore engineering