Installing new topside modules on an existing Floating Production Unit (FPU) in deep water can be a challenging task. The crane vessel and semi submersible move independently and lowering a relatively light module on a moving unit Ð which is also influenced by the load Ð is no easy feat.
Contact
Mailbox Offshore