JIPS
Joint Industry Project
offloading operability 1
Closed
This JIP's objective is to develop and validate tools that can aid the evaluation of the design and operation, the assessment of limiting weather criteria and the safety of offshore offloading operations (risk assessment).
Return to all JIPs
Download
General information (PDF)
relevant links
Authorities and regulations
Oil and gas
JIP MEMBERS ONLY
Offloading Operability 1.ZIP