Open water model tests will be conducted for a systematic series of CPPs and ducted CPPs. The number of cases which will be tested depends on the number of participants in the JIP. At this stage the following series is foreseen:
- C4-40, C4-55, C4-70
- C5-75
- D4-40, D4-55, D4-70 in both 19A and 37 ducts
The tests will cover the complete range of pitch settings as well as both flow directions so that the complete 2 quadrants can be derived.