Expert photo

Dick ten Hove

Senior Project Manager

Maritime Operations

Send Dick ten Hove a message

Publications
Magazine
MARIN research plays key role in new government guidelines for inland waterways in rivers

21 Jan 2020

Rijkswaterstaat is responsible for the design, construction, management and maintenance of the main infrastructure facilities in the Netherlands, ...
Paper
Guidelines for inland waterways in rivers

30 Sep 2019

The Dutch Rijkswaterstaat is responsible for the design, construction, management and maintenance of the main infrastructure in the Netherlands. ...
Paper
Measuring workload and performance during complex manoeuvres, both on a manoeuvring simulator and on board

1 Oct 2012

To control and increase human performance in the maritime field a methodology to measure workload and performance is needed. This paper describes a ...
Paper
Physiological Measurement Applied in Maritime Simulations - A newly developed method to measure workload on board of ships

15 Jan 2011

This article describes a method to measure the effects of workload and human performance on board of ships in navigation tasks. Physiological ...
Paper
Research into the Effects of Motion Simulation on Tugboat Captain Training and Performance in Bridge Simulators

1 Jun 2010

Application of motion simulation is currently not common within nautical bridge simulators. It is expected that simulation of physical ship motions ...
Paper
Probabilistic Design of Channel Widths

10 May 2010

To date, probabilistic design methods of channel widths are still under development. This is partly because there are no suitable models available. ...
Magazine
A world first as the Adriatic LNG terminal is placed at final destination

24 Apr 2009

Reading time 6 minutes

September 16 last year, marked an historic milestone when the first offshore, gravity-based structure in the world for the unloading, storage and ...
Magazine
Fast-time ship manoeuvring simulation comes in the spotlight

1 Dec 2003

Reading time 6 minutes

The limitations and risks of any offshore facility must be assessed in the earliest stage of their development as possible and fast-time simulation ...