DCV Balder instrumented for lifetime extension

AuthorsPieter Aalberts
Conference/JournalMARIN Report 99
DateApr 26, 2010
Reading time3 minutes

Heerema Marine Contractors (HMC) contracted MARIN to design, install and maintain a Fatigue Monitoring System for the J-Lay Tower of the Deepwater Construction Vessel (DCV) Balder.

Tags
waves, impacts and hydrostructuralmeasurements and controldata scienceoil and gastransport and shippingmonitoringfatiguestructural response